Hilltop Wastewater Treatment Plant

The Hilltop Wastewater Treatment Plant project was an upgrade and expansion of an existing wastewater treatment plant. Parsons’ scope included the procurement and installation of a new 3000 amp service, five motor control centers, PLCs, instrumentation package, and commissioning. Parsons preconstruction services provided numerous field coordination drawings and schedules defining the duct bank, manhole, and conduit layouts; it also provided point to point schedules for both power and instrumentation wiring as well as detailed building layouts to coordinate the prefabrication and delivery of site buildings with all of the necessary openings ready to receive the numerous electrical conduits entering these buildings. Parsons Technologies provided the Fiber Optic communications for this project.

Parsons

Parsons