Mayo Civic Center

Event center expansion of new meeting rooms, ballrooms, and kitchen, along with a remodel of the existing presentation hall, offices, and locker rooms. ASI constructed five new telecommunication rooms and installed an entirely new fiber and copper backbone network between the new and four existing telecom rooms. The Mayo Civic Center project consisted of installing new category 6 data cables for network, new category 6 cables for AV, new 4-strand OM4 fiber for AV, new category 6A for WAP’s, and new category 6-sheilded for digital displays per Division 27. ASI also supplied and installed 30 new IP cameras along with a Seneca server and configured in Division 28. They also included a new S2 access control system for new and existing spaces as part of Division 28.